Infrastructure > Projects Underway > Road construction

CPTM – Line 7 Rubi

Together with Companhia Paulista de Trens Metropolitanos, Mendes Júnior is responsible for operation and installation of a permanent track and a catenary traction energy supply system for the No. 7 Line (Ruby). The work is constructed between Km 00-000 and Km 13+365 for the A Line.
  • Project CPTM – Line 7 Rubi
  • Contractor CPTM
  • Address Rua Antonio Fidélis, 15 - Lapa de Baixo - São Paulo-SP
  • Location São Paulo - SP
  • Technical description Fornecimento e instalação de via permanente e sistema de suprimento de energia catenária de tração.
  • Segment Infrastructure, Projects Underway, Road construction

Operation Segments